October 27, 2016


 Cole Construction began work on Sunday, 10/23.  Six hours in, they had nearly a third of the library prepped.  Bookshelves and office furniture were moved and the old glue was being scrapped off the sub-floor.  Best of all, there was no dust or debris in the air to worry about; a distinct advantage of the scraping over bead-blasting method.

Scraping! This wheeled machine had a flat blade at the front.
The yellow rolls on the floor are old adhesive.


Main floor, facing the circulation desk


Heritage Addition - Bookcarts provided by contractor

Behind the circulation desk
Staff area:  check-in and sorting space
Juvenile nonfiction area

Lift system to move shelves